From Heilongjiang province construction department is aware that in order to reduce energy consumption, improve the heating efficiency, achieving true how much hot AC, the province will be from October 1, the full implementation of the new heat metering reform, has completed the construction and completion of heating renovation of the existing residential buildings which are cancelled in area valuation charges by using thermal valuation fees.
As China's coldest winter, most of the Heilongjiang province in winter heating period up to six years. Due to technical limitations, Heilongjiang Province residents hot fee has been collected by the use of space. Simply press the heating area receive hot charges due are not conducive to the cultivation of heat-saving awareness of users, the lack of fairness, and questioned by residents.
To make a real hot fee collection mode, improve population reflecting public opinion awareness initiative, Heilongjiang province through years of scientific and technological research, finally broke through the charging technology bottlenecks and at the 2009 winter far in Harbin city oasis community of 2700 more families to heat metering pilot family. Pilot community use heat metering "room temperature"-off of the controller, the remote control to enter the appliance indoor heating pipelines in hot water, the temperature reached residents set off automatically after. , The heat heating charge users to implement two heating price, that is, base hot price plus metering hot price.
Through a heating period of pilot, pilot community residents generally reflect the good effect, marked the comprehensive promotion of metering the time is ripe for reform. Recently, Heilongjiang province officially issued a document requirements from 1 October this year, the province full cancellation charges in the area, the residential thermal charge, new completion construction and existing residential buildings must complete heating renovation.
To ensure quality, energy-saving effect is achieved in Heilongjiang province, also provides for existing residential building energy-saving alteration must be after acceptance. No organization building energy acceptance or experience not qualified engineering, as well as failure to install the heat metering device of the works shall be put into service.
No comments:
Post a Comment