Case study: experts advise owners do warm cannot only see price

The following is a second renovation of the House, compound structure. Owners because want to keep the wood flooring in the bedroom, in the living room is warm and the rest room into a radiator, the bathroom also with radiator. It should be said that this assumption is reasonable.

The problem is in the warm construction, it can be said to mess. Here are the owners of the picture. Interested can analyze and see. Definitely a good construction site materials.

Case study: experts advise owners do warm cannot only see price

Case study: experts advise owners do warm cannot only see price

Case study: experts advise owners do warm cannot only see price

Case study: experts advise owners do warm cannot only see price

Case study: experts advise owners do warm cannot only see price

Case study: experts advise owners do warm cannot only see price

Case study: experts advise owners do warm cannot only see price

Things like this: on the second floor of the radiator is not installed, because the wrong size and power, the owners found the construction party cannot reach her request, let them down. To find us, let us then turn left to finish the project.

I went to the scene and found that has not proceeded to do. Because from the initial design is a problem, the radiator is not with warm at the same time there is a water separator, must have mixed water device. To the second floor there are 5 circuit, water flow rate, pressure loss is big, and competent is 25, should you want to use the circulating pump. Seen from the figure, the coil design installation layout is not good, very confused. There are also other small problems.

This is a redo of the project, or do a lot of things right. The landlord for the physically challenged (Tian), yet below.

I would like to remind the Assembly warm friends, be sure to have quite the construction party, see design is not a specification, materials for accuracy, quality and quantity, construction is fine. Final acceptance testing, be sure to personally present, confirm that the entire heating engineering quality standards, can rest assured that use.